How to Fold Hems and Laps for Custom Flashings Around Penetrations

Custom Flashings

Every roof penetration interrupts the surface that carries rain away, so the flashing around it must do more than cover a gap. Its hems stiffen exposed edges, while its laps guide water over adjoining pieces rather than toward a seam. Understanding how these folds work helps produce custom flashings that fit the roof’s shape and support dependable weatherproofing.

Plan custom flashings around roof penetrations

Before cutting metal, map the penetration’s position in relation to panel ribs, seams, and the path rainwater takes down the roof. A sleeve or base flashing must fit the opening while allowing the surrounding roof system to move as temperatures change. Measurements should include the penetration’s outside dimensions, the required upstand, and enough material for the attachment flange and folded edges.

Two design decisions shape the result: how the flashing sheds water and how its edges resist movement or damage. The following details help establish a workable layout before forming begins.

Choose lap directions that shed water

Arrange folded laps so the upper piece overlaps the lower piece in the direction water travels. On a roof, that generally means an upslope component covers the edge of the downslope component, reducing the chance that runoff will be driven beneath the joint. Where the flashing meets a wall or another roof feature, the overlap must also suit the local geometry.

Allow for roof profile and movement

A flashing that crosses raised ribs needs a shape that accommodates those contours without leaving open channels. For a small pipe between ribs, a flanged sleeve may provide a straightforward arrangement; an opening that crosses a rib or several panel sections needs a detail suited to that wider interruption. Allowance for thermal movement is also important, particularly where metal flashing meets a different material.

Form folded hems for stronger flashing edges

A hem folds the sheet-metal edge back on itself, creating a less exposed edge and adding stiffness. On custom flashings, hems can finish an exposed flange, reduce sharpness, and help a formed piece hold its shape during handling. Their dimensions should match the metal thickness, bend radius, and available clearance.

Mark and form each hem in sequence

Mark bend lines accurately and keep them square to the intended edge. Make the initial fold evenly, then close it with a suitable tool or a controlled sequence of pressure; a wood block can help distribute force when appropriate, while direct hammering may dent or distort the flashing. Test the sequence on a suitable offcut if the material or profile is unfamiliar.

Inspect hems before installation

Check the fold for splits, coating damage, waviness, and sharp projections. Confirm that the edge remains straight and that the hem leaves the flange broad enough for its intended attachment. If the metal has been cut or scratched, use an appropriate repair method recommended for that roofing system rather than leaving exposed areas untreated.

Custom Flashings

Assemble folded laps for reliable flashing installation

Dry-fit the formed pieces before fastening them. This check reveals whether the hems collide, whether the flashing sits flat against the roof profile, and whether the overlaps remain oriented to shed water. Make adjustments on the ground whenever possible instead of forcing a misaligned joint into place on the roof.

Use the following inspection points to assess the detail before final installation. Each one supports penetration sealing, but none replaces a flashing design suited to the roof assembly.

  • Confirm overlap direction: upper pieces should cover lower edges along the intended drainage path.
  • Check fit at ribs and openings: the flashing should follow the profile without leaving unintended gaps or distorting panels.
  • Review fastener placement: locate fasteners where the system permits, avoiding exposed water channels whenever the design allows.
  • Use compatible sealants and accessories: follow the roofing manufacturer’s requirements and keep dissimilar metals appropriately isolated.

Sealant or butyl mastic may be specified at particular joints, but product choice and placement vary by roofing system. Follow the relevant installation instructions, including requirements for fasteners and accessories; a sealant line should not be treated as a substitute for correctly arranged folded laps.

Flashing feature Purpose Inspection point
Folded hem Stiffens and finishes an exposed edge Look for even folds and coating damage
Upslope lap Directs runoff over the joint Verify that the upper piece covers the lower one
Penetration upstand Raises the flashing around the opening Check fit, height, and continuity around the perimeter
Fastened flange Secures the flashing to the roof assembly Confirm approved locations and compatible hardware

Once the flashing is installed, inspect its perimeter and nearby panel joints for open seams, loose edges, or signs that water could be directed beneath the metal. Roof flashing techniques must match the specific system, exposure, and penetration geometry; when a detail is uncertain or the opening is complex, a qualified roofing professional can assess the design and installation requirements.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top